Skip to product information
1 of 7

Easy-Going

Easy-Going Outdoor Patio Curtains 2 Panels, 110x84 inch, Teal | Privacy

Easy-Going Outdoor Patio Curtains 2 Panels, 110x84 inch, Teal | Privacy

Regular price $99.98 USD
Regular price Sale price $99.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Product Overview

Functional and waterproof, the Easy-Going Outdoor Patio Curtains 2 Panels, 110x84 inch, Teal | Privacy Waterproof Windproof Detachable Tab Top and Bottom Tab Curtain for Cabana, Porch and Pergola earns its place in backyard projects through outdoor performance. Designed with Polyester, measuring 84"L x 110"W, available in Teal. Notable features include tab top and top bottom, contributing to its lightweight character.

Key Features

  • Tab Top & Bottom: Constructed with detachable tab top, which makes the curtains to be moved around and hung with ease. The bottom tabs make the curtain fixed enough that it won't be blown by the wind. It provides protection against rain, snow, heavy wind and other harsh weather element.
  • Multiple Options: Come in a range of colors and sizes to match the decoration of your outdoor space. Each package includes 2 panels of outdoor curtains, each measures width 110 inch by length 84 inch.
  • High Quality Material: 100% polyester fabric with waterproof processing technology, is also able to block out sunlight and UV ray. It is efficient in noise reducing, insulating against heat.
  • Widely Used: Perfect for both indoor and outdoor spaces. These outdoor curtains provide great privacy and safety for your porch, pool, balcony, gazebo, patio pergola, garden, bathroom or indoor rooms.
  • Easy to Care: The curtains are machine washable in cold water, please do not bleach, tumble dry and iron at low temperature.

Why Choose the Easy-Going Outdoor Patio Curtains 2 Panels

The Easy-Going Outdoor Patio Curtains 2 Panels, 110x84 inch, Teal | Privacy Waterproof Windproof Detachable Tab Top and Bottom Tab Curtain for Cabana, Porch and Pergola delivers on three fronts: all-season build, tab top, and easy installation. This combination makes it suited for serious outdoor curtains use.

Best For

The Easy-Going Outdoor Patio Curtains 2 Panels is best suited for: both indoor and outdoor spaces.

Quick Summary

The Easy-Going Outdoor Patio Curtains 2 Panels is a Outdoor Curtains product by Easy-Going. Brand: Easy-Going. Color: Teal. Material: Polyester. Product Dimensions: 84"L x 110"W. Opacity: 85. Price: $99.98.

Product Specifications

Specification Details
Brand Easy-Going
Color Teal
Material Polyester
Product Dimensions 84"L x 110"W
Opacity 85
View full details