Skip to product information
1 of 7

Smokey’s BBQ

Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella, Table

Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella, Table

Regular price $103.98 USD
Regular price Sale price $103.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Product Overview

Step-by-step, the Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella, Table Market Umbrella with Tilt and Crank, Outdoor Umbrella for Garden, Deck, Backyard, Pool and Beach - Red addresses practical situations needs through heavy-duty engineering and everyday convenience. Featuring Metal, available in Red, designed for sun. Notable features include top-mounted solar and solar panels, contributing to its thoughtfully designed character.

Key Features

  • Top-mounted solar panels absorb energy throughout the day to light up every evening with a pre-strung set of 18 LED lights for up to 6 hours!
  • A heavy-duty steel pole pairs with a 6-rib steel frame to protect the built-in, push-button connector for your lights and solar panel
  • Features a hand-operated crank to open and close the umbrella with ease, while a push-button tilt system adds extra protection for the sun
  • Air flows freely through open space at the top of the canopy and creates a cooling cross breeze while adding extra stability against heavy winds
  • Enjoy your garden day or night as this umbrella protects you from the sun and bathes your outdoor meals in a glow of soft, LED light! Matching umbrella base: SKY3784(freestanding) or SKY4241(through table); OVERALL DIMENSIONS: 90"(Dia) x 88.75"(H)

Why Choose the Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella

The Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella, Table Market Umbrella with Tilt and Crank, Outdoor Umbrella for Garden, Deck, Backyard, Pool and Beach - Red earns its place through well-made quality and thoughtful features including top-mounted solar. The result is satisfying experience that lasts.

Best For

The Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella is best suited for: Patio, Adult, Lighted.

Quick Summary

The Best Choice Products 7.5ft Solar Umbrella LED Lighted Patio Umbrella is a Umbrellas product by . Brand: Best Choice Products. Color: Red. Specific Uses For Product: Sun. Recommended Uses For Product: Patio. Target Audience: Adult. Price: $103.98.

Product Specifications

Specification Details
Brand Best Choice Products
Color Red
Specific Uses For Product Sun
Recommended Uses For Product Patio
Target Audience Adult
Special Feature Lighted
Shape Hexagonal
Shaft Material Metal
Handle Material Metal
Frame Material Steel
View full details